MANILA, Philippines — President Ferdinand Marcos Jr. on Sunday visited Tuba, Benguet to inspect a rock shed project on Camp 6 in Kennon Road.
Marcos inspects rock shed project in Benguet

Accompanied by Baguio City Mayor Benjamin Magalong, Marcos again expressed his dismay after seeing that the P264-million project of the Department of Public Works and Highways (DPWH), completed in November 2024, is in “precarious condition.”, This news data comes from:http://totu-kg-fy-pu.ycyzqzxyh.com
Marcos inspects rock shed project in Benguet
“It’s as if nothing was done,” he lamented in Filipino. “It has eroded. It eroded because the protection wall is very weak.”
“It is very low and very weak that’s why the water can seep in,” he added.
Parts of the structure’s foothold caved in when Typhoon Emong pummeled the region last July.
- Manila marks National Heroes Day with job fair
- Alex Eala targets US Open Round of 32 in rematch against Spanish rival
- SSS rolls out historic pension reform program
- Metro Manila disaster agencies expand response areas in preparation for 'Big One'
- PH economic losses hit 100B from corruption in flood control projects
- Xi says China 'unstoppable' in parade opening speech
- Marcos suspends importation of regular, well-milled rice for 60 days
- Workers urge Marcos to stop corruption by banning political dynasties
- DMW, pharmaceutical firm sign agreement to boost access to medicines, hospital services for OFWs, families
- House panel defers 2026 DPWH budget until agency submit changes